A-A-59959
Table IV. Certification and analyses.
Paragraph
Required Certifications and Analyses
3.3 Design and construction.
Contractor documentation that the Mounter and
Demounter, Pneumatic Tire, Computer
Controlled Torqueing System is in accordance
with all applicable EU requirements in order to
have the "CE" marking affixed.
3.3.4.1 System safety.
Contractor system safety hazard analysis (see
5.5.2).
3.3.4.6 Electrostatic discharge.
Contractor analysis of the electrostatic
discharge requirement (see 5.5.4).
3.3.7 Service life.
Contractor analysis of
the
service
life
requirement (see 5.5.5).
5.5.2 System safety hazard analysis. A system safety hazard analysis of the Mounter and
Demounter, Pneumatic Tire, Computer Controlled Torqueing System shall be conducted in
accordance with 4.3.1 through 4.3.8 of MIL-STD-882 to demonstrate compliance with the
mishap risk requirement of 3.3.4.1.
5.5.3 Noise test. The Mounter and Demounter, Pneumatic Tire, Computer Controlled Torqueing
System shall be tested to demonstrate that the noise level of the operating unit meets the noise
limit of 3.3.4.5.
5.5.4 Electrostatic discharge analysis. An engineering analysis shall be performed to demonstrate
compliance with the electrostatic discharge requirement of 3.3.4.6.
5.5.5 Service life analysis. An engineering analysis shall be performed to demonstrate
compliance with the service life requirement of 3.3.7.
5.6 Maintainability analysis and demonstration.
5.6.1 Preventive maintenance demonstration. All recommended preventive maintenance tasks
shall be performed and the task times shall be recorded. It shall be demonstrated that the forces
required do not exceed those allowed in MIL-STD-1472.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business